ENZAD Ltd provides Building Safety Regulator submission coordination for Higher-Risk Buildings, covering Gateway 2 and Gateway 3, so architecture, structures, fire and MEP arrive as one submission.

Back home

BSR Gateway coordination

Gateway 2 is the application before construction of a Higher-Risk Building can start. Gateway 3 is the completion stage, before the building can be occupied. Both need a coordinated package: architecture, structures, fire, MEP and the specialist designers, presented as one submission rather than a set of separate consultant folders.

What the coordinator does

A Gateway coordinator does not take design responsibility from the designers, and does not replace the Building Regulations Principal Designer. The coordinator manages the submission: setting the requirements, allocating information responsibilities, tracking deliverables, and checking that drawings, specifications and strategies tell the same story.

That includes checking whether architectural drawings align with the fire strategy, whether structural and MEP proposals are coordinated with compartmentation, and whether the document register shows what is complete, what is outstanding and who owns it. The aim is to find the gaps inside the design team before they become queries from the Building Safety Regulator.

Who appoints

The client, the architect, or the project manager. The coordinator supports the Principal Designer and the wider team. Approval is a decision for the Building Safety Regulator. Coordination improves the completeness and consistency of what is submitted. It is not a guarantee of approval.

Experience

While Director at MBH Design Studio Ltd, Ola acted as BSR Coordinator and Principal Designer on a 200-bedroom co-living scheme in Kingston upon Thames, which received Gateway 2 approval from the Building Safety Regulator. ENZAD Ltd is a new practice. That project is experience, not an ENZAD Ltd commission.

Blog

Why a Gateway 2 Submission Coordinator Adds Value to the Design Team

For architects and project managers delivering Higher-Risk Building (HRB) projects, Gateway 2 brings an additional level of coordination, evidence and regulatory scrutiny.

The challenge is not simply producing a compliant design. It is ensuring that information from architecture, structures, fire, MEP and specialist designers comes together as one coherent, coordinated and submission-ready package for the Building Safety Regulator (BSR).

This is where a dedicated Gateway 2 Submission Coordinator can add real value.

Protecting the design team's time

Architects already carry significant responsibility for design coordination, technical delivery, clients and programme. Managing the Gateway 2 submission process can become another substantial demand on senior project resources.

A Submission Coordinator can manage the process without taking design responsibility away from the designers: establishing submission requirements, allocating information responsibilities, tracking deliverables and identifying gaps before submission. This allows architects and designers to concentrate on resolving the building rather than administering the submission.

Finding problems before the BSR does

Individual consultants naturally focus on their own disciplines. A Submission Coordinator looks across the entire submission: checking whether architectural drawings align with the fire strategy, whether structural and MEP proposals are coordinated with compartmentation requirements, and whether specifications, schedules and drawings tell the same story.

A good set of individual consultant packages does not automatically make a good Gateway 2 submission. The objective is to identify gaps and inconsistencies within the design team before they become BSR queries.

Giving Project Managers visibility

A structured submission matrix and document register provide a clear picture of Gateway 2 readiness: what is complete, what remains outstanding, who is responsible and what could prevent submission. Rather than asking "Are we ready for Gateway 2?", the project manager has evidence of exactly where the project stands.

Supporting the Principal Designer

Gateway 2 coordination does not replace the Building Regulations Principal Designer or transfer designers' statutory responsibilities. Instead, the coordinator supports the PD and wider team by managing the submission process, information interfaces and readiness while responsibility for design and compliance remains with the appropriate dutyholders.

Reducing submission risk

No coordinator can guarantee BSR approval. What dedicated coordination can do is improve the quality, completeness and consistency of the information presented to the Regulator.

The real question is therefore not whether the design team can coordinate its own Gateway 2 submission. It is whether that is the best use of senior design-team time, and who is ensuring that multiple individual design packages come together as one coherent regulatory submission.

ENZAD Ltd. provides BSA and CDM Principal Designer services and BSR Gateway 2 and 3 Submission Coordination for Higher-Risk Building projects.